There was a problem loading the comments.

Explosion deflector for LoadMaster

Support Portal  »  Knowledgebase  »  Viewing Article

  Print

The explosion deflector mounts to the upper right-hand side of the Load Master frame. There are two holes cast into the frame, into which two 10-32 x 1/2" self-tapping screws should be installed. Remember that the Load Master primes on the up stroke of the carrier, so the deflector should be between you and the primer tray when the carrier is all the way up.


Share via

Related Articles


Self-Hosted Help Desk Software by SupportPal

Categories

Tags

© Lee Precision, Inc.